CNC MACHINING
In the very beginning, GWM introduced the CNC machining process in order to produce its own castings to achieve more precise dimensions.
After many years of development, GWM’s machining staffs has been able to provide the customers a complete machining service from raw material to finished product for stainless steel, aluminum, copper, alloy and plastics parts.
MACHINING CAPACITY
RAW MATERIAL
SURFACE TREATMENT
What is CNC Machining?
Since ancient times, human has learned to use tools to cut and drill the surface of a workpiece to obtain the desired shape. CNC Machining formally utilizes this principle to automatically cut, sharpen, grind, drill, and bore the workpiece in accordance with a set program on modern CNC machining equipment to obtain metal parts that meet the design requirements of the drawing.
Features
There is no doubt that machined workpieces achieve the highest dimensional precision among all metalworking processes.
There is also no limit of MOQ for the CNC Machining parts. And a faster delivery time could be easy to meet compared to lost wax casting.
However, for the parts with complex structures, CNC machining often costs more to complete the task.
Sometimes, the choice of raw materials is not as flexible as casting due to the constraints of the raw material market.
GWM CNC MACHINING WORKSHOP
WHY WORKING WITH GWM?
In GWM, we believe that good understanding and communication is the key to success.
Over the past 19 years, we have successfully manufactured 32,000+ new metal parts based on our customers drawings in more than 10 industries.
Need to modify the product structure? Looking for lightweight solutions? Need a simple and fast sample production scheme? Want a door-to-door transportation scheme to reduce the trouble caused by transportation and customs declaration?
We are confident to provide you with the feasible suggestions and improvement plans based on our accumulated knowledge & experience in different industrial applications & foreign trade operation, to help our customers to improve the efficiency and reduce the costs.
Before production, the CAE software could help GWM to forecast the castings defects and find out the best solution.
During the production, an ERP system was built up from incoming inspection to packaging inspection, from self-inspection by production staffs to sampling test by QC inspectors. Most of the data are uploaded to the server which make the quality of each batch traceable.
Before shipment, a strict outgoing inspection is implemented. Material report and dimension report would be sent to customers to confirm the goods condition.
In the event of the quality objection, a quality improvement team will be established including engineering, manufacturing and quality department. The team’s aim is to prevent the recurrence of the same quality problem by verifying root cause and implementing preventive actions.
With the monthly production capacity of 250 tons, more and more customers are benefiting from our in-time delivery.
As a private company, GWM has also grown up from a small company.
The company’s continuous growth is supported by the backup of domestic and foreign customers, in addition to the company’s people-oriented and honest management philosophy and continuous investment to win market feedback.
When facing the market storm and the shock wave of the epidemic, we insist on thinking from the customer’s point of view, facing and negotiating together to solve problems.
After 19 years of development, GWM has become a mature and honestly operating supplier of customized metal parts, and has passed factory inspections by many globally renowned certification companies such as SGS and TUV Rheinland.
Welcome to contact us for the factory audit report.
OFFICE LINE
1.800.555.6789
EMERGENCY
1.800.555.0000
WORKING HOURS